Video: Liz builds a skin on frame kayak, Part 13


With the polyurethane cured, Liz starts the outfitting process to make this a fully functional kayak. Some of this stuff is optional, and some of it is standard on our kayaks.

In this video, she adds deck lines, seating, foot braces, backband, a drain plug, and various pad eyes for the perimeter lines. Not shown are the thigh braces and the folding pump clips under the front deck.

This video shows about 4 hours of work.

___
This post was originally featured on our Instagram feed.
See the original post and discussion here.

Follow Cape Falcon Kayak on Instagram »

Leave a Reply

Scroll to top